3M DP805
Harmonization Code : 3919.10.80 | Other self-adhesive plastic rolls not exceeding 20 cm wide.
Main features
- 1:1 Acrylic Mixing
- 3 to 4-Minute Work Life
- 2,000 psi at 30 Minutes
Product Description
3M Scotch-Weld Acrylic Adhesive DP805 is a toughened, non-sag two-part acrylic adhesive for structural bonding of metals, ceramics, wood, and most plastics. Base and accelerator mix 1:1 by volume or weight. At 23 deg C, typical work life is 3 to 4 minutes in a static mixing nozzle, and set time is 7 to 10 minutes to reach 0.3 MPa overlap shear. Applied open time is approximately 3 minutes. Typical full cure takes 8 to 24 hours at 23 deg C, using a criterion of at least 80% of ultimate aluminum-to-aluminum overlap shear. Typical cured Shore D hardness is 79 at 23 deg C.
Key features
- 3 to 4-minute work life: This typical maximum static-mixer residence interval applies at 23 deg C; applied open time is approximately 3 minutes.
- Non-sag component rheology: Typical viscosities at 23 deg C are 75,000 cP for the base and 150,000 cP for the accelerator by Brookfield RVF, spindle 7 at 20 rpm.
- Shore D 79 cured hardness: This typical cured-material value is measured at 23 deg C by ASTM D2240.
Applications
HVAC and appliance metalworking; specialty vehicles; sign manufacturing; bonding plastics, composites, and powder coats to metal.
TDS, SDS & Technical Documents
Technical Specifications
General Properties
Other Properties
Electrical Properties
Thermal Properties
Additional Information
As-supplied / before-processing properties
Values are typical and not specifications.
| Property | Value | Unit | Method / condition |
|---|---|---|---|
| Mix ratio by volume (B:A) | 1:1 | - | Two-part system |
| Mix ratio by weight (B:A) | 1:1 | - | Two-part system |
| Base viscosity | 75,000 | cP | 23 deg C; Brookfield RVF |
| Accelerator viscosity | 150,000 | cP | 23 deg C; Brookfield RVF |
| Applied open time | 3 | min | Before bond closure |
| Work life | 3 to 4 | min | 23 deg C; static mixing nozzle |
| Set time | 7 to 10 | min | 23 deg C; time to 0.3 MPa overlap shear |
| Time to full cure | 8 to 24 | h | 23 deg C; time to at least 80% ultimate overlap shear |